Construction site transportation
Regardless of the size and location of the construction site to be served, cable transport systems enable people and equipment to be transported to the site with a high degree of efficiency.
24 hours a day, 365 days a year, construction cableways have proven their worth on every continent.
With an adaptation of the hoists, it becomes possible to transport ore, aggregates, vehicles, or equipment of all kinds.
As part of these studies, we intervene to:
The shape and size of the structures of a construction site cable car are determined by the nature of the items to be transported.
When carrying out projects of this type, our company provides:
Our attention is focused on the following elements:
Overall coordination
Static calculations and plans
Site supervision and financial monitoring
Safety plans and usage plans
Commissioning
Building structures
Pylon foundations
Metal towers
Project references
Our achievements demonstrate the diversity and quality of our expertise. Here are a few projects carried out locally and internationally that illustrate our expertise and our ability to support resorts of all sizes.
SWITZERLAND:
- Téléphérique de La Léchire à Fribourg (7 to)
- Téléphérique de Fionnay-Louvie (Val de Bagnes)
- Téléphérique d’Arolla (P4)
- Téléphérique de la Gougra (Mottec-Zinal)
- Téléphérique Weisshorn
AMENAGEMENT CLEUSON-DIXENCE :
- Téléphérique: Plan Désert-Tracouet (15 to)*
- Téléphérique: Dent de Nendaz (5 to)*
- Téléphérique: Méribé-Chargeur (15 to)*
- Téléphérique: Condémines-Péroua (5 to)*
* Work carried out as a subcontractor for a builder